The Microsoft UltraCam Team recently installed an UltraCam Eagle at Keystone Aerial Surveys, Inc. in Philadelphia, Pennsylvania.
Keystone’s new system is the first UltraCam Eagle to be delivered in North America. Read the UltraCam Blog to learn how quickly and easily installation in the Cessna 310 was and how Keystone expects to additionally benefit from the reduced physical form factor and weight of the new UltraCam, as well as from its many new features.
While there, be sure to sign up to automatically receive UltraCam blog posts.
Huge cost overruns and missed deadlines have long been the accepted norm for construction project operations. But as construction starts to pick up after a long hiatus, construction expert Barry LePatner stresses the importance of putting new rules in place to make construction cost containment the way of the future for the construction industry.
In his State of the Union address, President Obama revealed his “Fix It First” plan for repairing the nation’s crumbling infrastructure. Infrastructure expert and author Barry LePatner explains why he fully supports the president’s plan.
Note: This article originally appeared on the Machine Control Online website and is the result of a presentation made at the recent Esri/ACSM Survey Summit in San Diego.
Reach our audience of Professional land surveyors and Geo-Technology professionals with your career ad. Feel free to contact us if you need additional information.