About Amerisurv| Contact    
Magazine | Newsletter    
Flickr Photos | Advertise    
HomeNewsNewsletterAmerisurv DirectoryJobsStoreAuthorsHistoryArchivesBlogVideosEventsImaging
 
advertisement


Subscriptions
Sponsored Page
Product Reviews
Software Reviews
Sponsored By


Continuing Series
     RTN
RTN expert Gavin Schrock provides everything you need to know about network-corrected real-time GNSS observations.
Click Here to begin the series,
or view the Article PDF's Here
Test Yourself

Got Answers?
Test your knowledge with NCEES-level questions.
  Start HERE
Meet the Authors
Check out our fine lineup of writers. Each an expert in his or her field.
Wow Factor
Partner Sites

machinecontrolonline 

symbianone
lbszone.com
GISuser.com

Associates

ACSM
GIA
ASPRS

newsnow 

Directory's Last Update
Directory last update: 2010-01-07 15:40:54
Home arrow Archives   The American Surveyor     

Rebuilding the Greens at The Olympic Club Lake Course Print E-mail
Written by Eric Gakstatter   
Saturday, 17 October 2009

A 4.758Mb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE

The history of San Francisco's Olympic Club dates back to 1860, making it one of the oldest such golf clubs in the country. The club has hosted four US Open tournaments over the years­with its fifth slated for 2012­and the Lake Course enjoys certain notoriety. It has no water hazards, no out-of-bounds, only one fairway bunker, and is one of the shortest golf courses to host the US Open, but nevertheless is considered by most in the game to be an excellent example of golf course design; some would even say a masterpiece. Ben Hogan, who is considered one of the greatest ball strikers in the history of the game, was said to have called it "the longest short course in the world".

Given its storied history, the idea of ripping up 18 green complexes and rebuilding them on a course that will host the US Open, arguably one of the most televised golf tournaments in the world, in less than four years is enough to cause any golf course superintendent more than a few sleepless nights. In other words, it had to be done correctly because the whole world will be watching.

The driving force behind the renovation might surprise you­nematodes. These microscopic roundworms were feasting on Olympic Club's Poa annua greens. These specific nematodes are prevalent particularly on golf courses in Northern California along the coast. An organophosphate nematicide called Nemacur has historically been used to manage these creatures but Nemacur has been withdrawn from the market. No other treatment is available so replacing the Poa annua with Bentgrass becomes one of the few viable alternatives. That's what the Olympic Club decided to do. They also decided that at the same time they would build the new greens to United States Golf Association (USGA) specifications and address lingering drainage issues. Essentially, a total rebuild of all 18 push-up green complexes.

The challenge was that the greens committee didn't want much to change. Out of 18 putting surfaces and three practice greens, club members wanted 14 of the greens on the Lake Course to remain exactly the same­as in, "exactly as is," explained Brian Koffler, the Lake Course superintendent.

"The membership was happy with those fourteen surfaces," Koffler said. This, coupled with the history of the course, made it critical to preserve the green surfaces just as they are. "The club was very adamant about putting the exact contours back on those putting surfaces," he added.

The operative phrase is "exactly as is". How does one create a 3D model of each green complex and then rebuild them exactly the same as they were with the exact same contours? The degree of horizontal measurement accuracy and even more so, the vertical measurement accuracy, required to accomplish this is on the order of two hundredths of a foot, or six millimeters.

Even without that level of accuracy, rebuilding the greens of a golf course is no simple matter. It requires creating a detailed contour map of each green complex before tearing it up and then rebuilding it layer by layer from the bottom up. It can be a tedious process to say the least, requiring a lot of data collection, as elevations must be checked at every point on the green as each layer is built; vertical accuracy is a must. The vertical measurement accuracy requirements of the Olympic Club Lake Course greens project increased the complexity of the task by orders of magnitude.

With 17 years of golf construction experience and on the leading edge of technology, Frontier Golf from Jones Mills, Pennsylvania was selected as the contractor. Frontier CEO Nick Scigliano said his company had done this sort of work before, but never to this magnitude; not all 18 greens and certainly not on a high profile track like The Olympic Club. The stakes were high as well as the pressure to perform.

Scigliano knew he needed a strong support team. After receiving the news that Frontier had been awarded the project, one of his first calls went to his survey equipment provider in Saxonburg, PA, Productivity Products and Services, Inc (PPS). PPS's salesman Dave Krautz had been a top-level earth moving and grading superintendent prior to working for PPS.

"Nick called me the day before Election Day," recalled Krautz. "He said he needed this project to be `a hundred and ten percent' and asked me to come with him to get started. A few days later, I was on a plane to San Francisco."

To begin with, Frontier needed to create a very accurate topographic survey of each green complex. Using a one foot survey grid, at least 2,500 shots were collected on the smaller greens and as many as 4,000 points were collected on the larger greens. The green complexes were then pulverized and the ground was prepared before the construction process could begin. Constructing a green consists of building several layers; subsurface drainage, gravel and sand. Each time a layer was built, Frontier had to grade check the entire green and cut/fill as necessary to match the original surface.

Frontier was planning on using Topcon's GR-3 GNSS receiver that tracks both GPS and GLONASS constellations. They were counting on the combined constellation to achieve the horizontal and vertical accuracy requirement. It became readily apparent from the start that GNSS alone wasn't going to cut it on this project given the tight vertical accuracy requirements, and the fact that too many of the satellites were blocked by the numerous tall trees that line much of the Lake Course. Two greens in particular required careful satellite mission planning to make sure enough satellites were in view during data collection and staking thanks to heavy tree canopy.

Fortunately, Frontier and PPS's Krautz had a back-up plan. They anticipated the potential problem posed by the thousands of trees on the Lake Course, especially with some being tightly nestled around the greens. They had the knowledge and experience to understand that GNSS alone may not work.

Krautz came prepared and packed Topcon's Millimeter GPS system with him on the flight to San Francisco. Millimeter GPS combines laser leveling for vertical accuracy with GNSS for horizontal positioning. This patented technology improves grading accuracy up to 300 percent over existing 3D-GPS machine systems, according to Topcon. Its PZL-1 laser transmitter sends out a wall of light 33 feet tall and up to 2000 feet in diameter and works with a PZS-MC machine control sensor or PZS-1 rover sensor that can be added to existing GPS systems.

"It's the first time we've used it at this magnitude," said Scigliano of Millimeter GPS. Frontier had used it on specific greens for various projects before, but never for each and every green on an entire 18-hole course. The technology has brought the firm a level of accuracy that it hasn't been able to achieve before. Prior to using Millimeter GPS, using only GNSS technology precluded the ability to obtain vertical accuracy better than a half an inch. "But with the Millimeter unit, there is zero bounce. It locks it in tight and allows us to work with fewer satellites," Scigliano said.

During the "core-out" phase of construction, when a green is being excavated to the new subgrade, Frontier would constantly utilize a GR-3 rover to check grade and make sure all of the little details of the green's original topography were present. It was a painstaking process. "In working days it was a day to core, half [a day] to drain, half [a day] to gravel blanket, and just about a day to mix, so it takes us three to three and a half days to turn a green complex over with that level of perfection because you can't go back­it's tedious, tedious stuff," Scigliano said.

Frontier actually utilized two Millimeter GPS systems and was able to work on two greens at the same time. Not only did the technology provide the accuracy necessary for the Lake Course greens construction, but Scigliano believes it enabled Frontier Golf to finish the project relatively quickly and with less manpower and cost than other contractors would have required. Others that had expressed interest in the project were looking at using two to three times the man hours to complete the project that Frontier required, Koffler explained.

Koffler was impressed with the relatively short amount of time it took to complete the project, which commenced in mid-November 2008. Frontier was essentially done by the first of February 2009; Koffler and his crew started sodding the greens in mid-March of 2009. Weather also aided the effort; the Olympic Club had planned on losing a month to rain delays. But the golf and weather gods smiled on San Francisco. While Northern California gets the bulk of its annual precipitation in the winter months, there had been very little rain through the middle of late January; "that aided us greatly," Koffler said. "The whole process moved much quicker than we had originally planned."

Frontier estimates that without using the Millimeter GPS technology, the entire Olympic Club project would have taken seven to eight times as long as it did, given the club's accuracy requirements. It also reduced the architect's need to be onsite; with the data points Millimeter GPS provided, CAD drawings for each green could be generated quickly and accurately both on and off-site. The technology also allowed the firm to respond quickly to some fine-tuning adjustments. Golf Architect Bill Love wanted to make on a couple of greens during the course of the project, Scigliano said. Having that data enabled them to redo the green in question quickly and review the new data with the client.

Overall, the experience of replacing the Olympic Club's Lake course greens using Topcon's Millimeter technology left Scigliano suitably impressed. "On our next greens restoration project, I'm going to turn to Millimeter GPS right out of the gate. The vertical accuracy is right on. I won't even try with GPS alone," he said. "It's pretty neat stuff," he said of the Lake Course project. "We are doing stuff here that's unique in our field."

All of the trouble the Olympic Club and Frontier Golf went to insure the accuracy of the greens surfaces begs the question­what changes were made to the greens on the four holes that didn't remain the same? Most of the changes are relatively minor and actually involve undoing changes that had been made in years past. On No. 7 tee, for example, a short Par 4, the Olympic Club's greens committee made the decision to move the green back 16 yards and create a two-tiered green, instead of a three-tiered green (the hole had been changed to a three-tiered green in the 1970s), and the bunkers were changed accordingly.

No. 8 saw the most substantial change. A Par 3, it used to be 140 yards facing straight toward the clubhouse. Frontier reoriented it, with the tee rotated 45 degrees to the right. "The Lake Course is a great layout," Koffler said. "But one of the big comments from the membership and golfers in general was that the Par Three's didn't offer enough variety." Another Par 3, No. 15, didn't get a length change, but a historical reorientation. Back in the 1990s when this green was rebuilt, there were changes made to the bunkers and contours of the putting surface; the Olympic Club had Frontier change the No. 15 green back to what it was conceptually prior to that change.

Perhaps the most notable change, however, came on the putting green at No. 18 on the Lake Course. It had a rather severe back-to-front slope at one time, so much so that it actually had a controversial effect on the end of the 1998 US Open, which was determined by one stroke. With the pin placed on a ridge at No. 18, a number of putts were rolling well past the pin. As a result, the green was flattened in 2000, but as Koffler explained, Olympic Club members felt it had become a little too flat; it had gone from perhaps too challenging to not challenging enough­ they could two-putt from anywhere on the green. So the Olympic Club decided to put back some of the challenge on No. 18.

For the club's part, not only did the project provide the Lake course with USGA spec greens while preserving the integrity of the original course, but it also provided the Olympic Club with a wealth of topological and survey data on the course, including the location of drainage and related pipes. Since the course had never been rebuilt before, there was no pre-existing data on drainage. This will insure the integrity of the course greens going forward. "This gives us a baseline for the future," Koffler said. "A golf course is a living breathing entity. It's going to evolve . . . so if fifteen years down the road, if we think something has changed dramatically, then we can check and see."

Eric Gakstatter has been involved in the GPS industry for 19 years, both as a product manager and power user. He is a contributing editor to GPS World magazine.

A 4.758Mb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE

 
< Prev   Next >

 American Surveyor Recent Articles
 
Editorial: America the Beautiful
After a rough wagon ride up to Pikes Peak in 1893, it was the view from the top that inspired Katharine Lee Bates to write a poem that became known as "America the Beautiful." Later set to music by Samuel Ward, its images have become part of our national conscience. Few there are who cannot sing at least one stanza of the four. It's no secret to ....
Read the Article
 
Brass Caps and Bandanas—Monumenting Anaktuvuk Pass
The Inupiaq are Eskimo people that live along the Arctic Ocean coast of Alaska's North Slope. In the last few hundred years a nomadic splinter group of the Inupiaq known as the Nunamiut moved inland away from the coast to follow the Caribou migrations and settled at Chandler Lake and the Killik River in the ....
Read the Article
  
GIS Mapping—­Campus Style
When Craig Moore switched from the academic side of Virginia Tech in October 2004 to become an engineer for site development in the campus' Facilities Department, he inherited a GIS that was not easily updated, and maintaining it was a problem. As a result, "it trailed off to nothing," he said. At that time the system focused on ...
Read the Article
Rabley 1-10 
Alleviating Poverty in the Developing World—Leveraging Property Rights with Geospatial Technology
According to renowned economist Hernando de Soto, the inability of persons worldwide to gain formal recognition of their real property rights is a major stumbling block to alleviating poverty. This lack of formal legal recognition of property rights is ...
Read the Article
Crattie 1-10 
A Dividing Line Brings Us Together
Oh, the lines. The shortest distance between two points? A line pulled to ring a bell? A colonial boundary between two long forgotten counties? Lines of dialog in a television documentary? The lines marked of legal secession from an illegally seceded state? Soup lines during the depression? A line connecting a hook to ....
Read the Article
Stocking 1-10 
Conference Review: Leica HDS 2009—Simplifying the Complicated
When GPS technology first began to filter into survey work, it was necessarily complex, depending, as it did, on satellites, atomic clocks, relativistic equations, and the like. Surveyors took this in stride and accepted that working with such arcane magic would always require expensive equipment, lengthy training, and endless hours of ....
Read the Article
 
FeedBack
Clarification Regarding 2009 Manual: I found the article "Why a Federal Surveying Manual is Relevant to the States," by Steve Hansen intriguing [Sept. 2009]. I interpret the author to mean that the new manual soon to be published (2009) is binding on all recovery, restoration, and retracements of the Public Land Survey regardless of the date of ...
Read the Comments
 
Vantage Point: Going Out with a Sigh
The story I'm about to relate took place over the space of seven months, and the outcome ratcheted up so much emotion that it was impossible to write at its last turning point. On October 1, 2009, the backhoes revved up their engines at 8 A.M. sharp, the earliest time allowed for such noise in my township, and La Ronda began falling to ...
Read the Article

 

Share this page with your favorite social networks! 

deliciousrssnewsletterlinkedinfacebooktwitter

Amerisurv Exclusive Online-only Article ticker
Featured Amerisurv Events
List Your Event Here
please
contact Amerisurv

SPAR 2010: 3D Imaging & Positioning for Engineering,
Construction, Manufacturing

February 8-10, 2010, The Woodlands Waterway Marriott Hotel & Convention Center,
The Woodlands (Houston), Texas

7th Annual Conference • 3D Laser Scanning • Mobile Survey & Mapping • LIDAR
• Dimensional Control • Asset Management • BIM/CAD/GIS Integration
• Security Planning & Forensics • Digital Heritage Preservation

 

To see our new event calendar click HERE

Google
 
AMERISURV TOP NEWS


  Sokkia Announces
50RX Total Stations

Online Internet Content

Sponsor


News Feeds

 
Subscribe to Amerisurv news & updates via RSS or get our Feedburn
xml feed

Need Help? See this RSS Tutorial

Historic Maps
Careers

post a job
Reach our audience of Professional land surveyors and Geo-Technology professionals with your career ad. Feel free to contact us if you need additional information.

 

RSS Feed Options
add to my yahoo!
add to newsgator
add to my AOL
add to bloglines
add to netvibes
add to my google
view with HubDog
technorati
xml feedView Feed XML
 
Need help implementing RSS?
Read this fine tutorial

Add to my Widsets
Amerisurv Mobile
Social Bookmarks

Amerisurv on Facebook 

Amerisurv LinkedIn Group 

Amerisurv Flickr Photos 

Amerisurv videos on YouTube 

twitter

 




The American Surveyor ©2003 - 2010 All rights reserved / Privacy Statement
Spatial Media LLC
905 W 7th St #331
Frederick MD 21701
301-620-0784
301-695-1538 - fax