August 19, 2009, San Jose, California. The anomalies in the recently launched SVN49(PRN1) was a chance to demonstrate the advanced multipath reduction capabilities of JAVAD GNSS Triumph technologies.
GPS World magazine, in its August 2009 issue, reported the nature of the anomalies of SVN49, and in a side-article showed how JAVAD GNSS Triumph receivers successfully cope with such anomalies, though the article failed to note that all data was taken from JAVAD GNSS Triumph receivers.
The same multipath reduction capabilities which removed the SVN49 multipath anomalies can remove the multipath effects which are a major source of error in precision positioning.
Figure below shows SNV49 (PRN1) code-minus-phase plot for usual correlator (magenta - C/A code, brown - P/L1 code) and for "mpnew" ( red - C/A code, green - P/L1 code), which shows almost all anomalies and satellite multipath are removed.
Huge cost overruns and missed deadlines have long been the accepted norm for construction project operations. But as construction starts to pick up after a long hiatus, construction expert Barry LePatner stresses the importance of putting new rules in place to make construction cost containment the way of the future for the construction industry.
In his State of the Union address, President Obama revealed his “Fix It First” plan for repairing the nation’s crumbling infrastructure. Infrastructure expert and author Barry LePatner explains why he fully supports the president’s plan.
Note: This article originally appeared on the Machine Control Online website and is the result of a presentation made at the recent Esri/ACSM Survey Summit in San Diego.
Reach our audience of Professional land surveyors and Geo-Technology professionals with your career ad. Feel free to contact us if you need additional information.