About Amerisurv| Contact    
Magazine | Newsletter    
Flickr Photos | Advertise    
HomeNewsPhotosNewsletterCommunityStoreJobsAuthorsHistoryArchivesVideoSubscriptionsBlog
 
advertisement


Subscriptions
 
Continuing Series
     RTN
Network corrected real-time is a technological approach to high precision GPS/ GNSS positioning that has been theorized about, studied, experimented with, and implemented in various academic, scientific, and commercial forms for nearly a decade.
Click Here to begin the series,
or view the Article PDF's Here
Test Yourself

Got Answers?
Test your knowledge with NCEES-level questions.
  Start HERE
Meet the Authors
Check out our fine lineup of writers. Each an expert in his or her field.
Sponsored By


Partner Sites

symbianone
lbszone.com
GISuser.com

Associates

ACSM
GIA
ASPRS

newsnow 

Home arrow Archives   The American Surveyor     

GIS Matters: Using the GCDB Print E-mail
Written by Rj Zimmer, LS   
Friday, 30 April 2004

Practical Applications of the Geographic Coordinate Database (GCDB) in GIS

A 520Kb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE

The U.S. Department of Interior Bureau of Land Management manages the Geographic Coordinate Database (GCDB) as a representation of the Public Lands Survey System (PLSS) of the Western states. The purpose for creating the GCDB was to standardize an improved and consistent digital framework for the basis of cadastral data. The Western Governors Association passed a resolution in 2000 declaring the GCDB as the best representation of the PLSS, and urging its adoption by federal, state, local, tribal governments and others for use by the surveying, mapping, and GIS communities. This article explains some of the utility of the GCDB in GIS for cartographic and topologic purposes.

Information about the GCDB is available on the BLM’s GCDB Home Page at www.blm.gov/gcdb/ (Figure 1). From there you can search and download GCDB data for those areas where the GCDB is available. It is important to note that the GCDB is not a legal record of survey information, but rather a database inventory of estimated positions of PLSS corners, or coordinated points (see disclaimer in Figure 2). From the GCDB Home Page you can access documents describing the database design, history, collection process, standards, information on the GCDB spatial reliability, and the point identification schema.

The areas of GCDB availability are shown on a map interface (Figure 3) that also facilitates the download of the GCDB data in ESRI shapefile format or ASCII flat file format. To gain an understanding of the GCDB database design, see the BLM standards document: www.blm.gov/gcdb/Standards/LSI-DDD-08-02-final.pdf

The GCDB GIS files are suitable as a cartographic reference to show township, range and section lines, coordinated points (e.g., quarter corners, meanders, etc.) and labels. Additionally, the lines, points, and polygons of the GCDB are used as the basis for geometry of other layers in GIS, surveying and mapping applications.

Cartographic Uses
The GCDB data set contains sufficient geometry and attribution for a variety of cartographic purposes. The data sets contain polygons for townships, polygons for sections, polygons for label descriptions (e.g., NWNW), points for township, section, section-breakdown corners, and other points (Figure 4). The rich attribution of the GCDB data allows for a variety of labeling and cartographic options, although some of the labeling requires a bit of string manipulation to conform to standard output. For instance, to create a typical township label requires concatenating (linking) four different fields along with some additional text, as shown in Figure 5. However, the cartographic results are quite workable as can be seen in Figure 6. The township and section lines shown in Figure 6 were created from the two polygon files. In this case, only the boundaries of the section and township polygons are shown. The labeling is based on the township attributes of the township polygons, and the section attributes of the section polygons. In this particular instance, the GCDB data are stored in a geodatabase, which provides better speed as well as data integration. More on that later.

One cartographic product of interest to surveyors is the reliability diagram. One can generate a diagram of the reliability of the coordinates for each PLSS corner in the GCDB from the accuracy values in the COORD point file (coordinated points). The COORD point file has accuracy fields for the X component and the Y component of the horizontal accuracy of the coordinates for each point. The values given are in feet. Typical errors are around 40 feet, but as shown in the Figure 7, larger errors are also possible. The magnitude of the errors is a function of the amount and quality of control and survey data that went into creating the GCDB for any particular area. Some areas had ample survey control and good supporting survey data, while other areas had poor surveys and/or little survey control. Therefore, the results vary considerably. Anyone who is not satisfied with the accuracy of the GCDB in their area of interest can work with the BLM to reduce the magnitude of the errors. The BLM is drafting a process for improving the spatial accuracy of the GCDB using a combination of inputting existing survey data and acquiring new survey control. This process will be more fully described in a later issue. The overall horizontal reliability of the coordinate can be calculated from X and Y error estimate vales, and then symbolized, such as shown in Figure 7. In Figure 7, the size of the dot is related to the magnitude of the estimated error--the larger the dot, the greater the error. The numbers next to the dot represent the magnitude of the estimated error in feet. Figure 7 is a quick and straightforward characterization of the distribution of error across this particular township. Perhaps more useful is to calculate the reliability of entire sections of lines between points in order to help understand the spatial distribution of the errors. Such calculation and conflation of values from the point geometry to the polygon geometry requires some GIS analysis work and a little computer programming. Nevertheless, it is useful when viewing the reliability from the perspective of polygon geometry, such as the reliability of parcel boundaries based on GCDB.

Topologic Uses
The greatest value of the GCDB is as a basis for other GIS layers, such as land ownership boundaries, government unit boundaries, fire, conservation, or school districts or others. Again, the reasons for using the GCDB are to standardize on a common PLSS and to improve the spatial accuracy of the PLSS representation. New GIS data that is based on the Figure 5 Formatting the township string for labels GCDB framework should better align with other GIS layers from other sources. In addition, existing GIS data can be adjusted to fit the GCDB.

Topology, which defines the relationships between GIS layers, is generated by storing GIS layers in a geodatabase, then establishing the relationships between layers. The GCDB data design supports topology. In the PLSS states, legal descriptions for properties--public or private, as well as government and non-government agency boundaries--are based on the PLSS. In addition to federal lands (e.g., U.S. Forest Service), fire districts, school districts, county boundaries, and a variety of administrative boundaries such as census tracts and voting precincts, all have some elements of the Public Lands Survey System in their legal descriptions. Thus, these legal descriptions have a topological relationship with the GCDB. That is, the lines of legal descriptions should coincide with the lines of the townships and the lines of the sections or parts of sections. One can build a GIS layer from such legal descriptions by snapping the lines to the coordinated points of the GCDB.

Generating the topological relationships between the GCDB and existing GIS layers is a bit more problematic and can be a tedious undertaking. In order to make an existing boundary (such as a fire district boundary) conform to the GCDB, the existing geometry must be edited to make the vertices of the existing boundary snap to the GCDB (coordinated points or vertices of the section or township polygons). Alternatively, some of the snapping may be automated through the construction of a topological relationship between the layers of the GCDB and the boundary layer. However, the results from an automated topological process, where a search radius is generalized for the entire dataset, can yield unpredictable results, so this must be done with care.

The GCDB is a work in progress, and surveyors are helping to make the GCDB a reality, whether by developing the GCDB or improving it. The GCDB development and maintenance is a cooperative effort that benefits the entire surveying, mapping, and GIS community. Adopting the GCDB as your PLSS standard, is a step toward data integration and enhanced data sharing.

Rj Zimmer is registered in Oregon and Montana, and has more than 25 years of surveying experience in the private and public sectors. He is the GIS Consultant & GIS Center Manager for the City of Helena ­ Lewis & Clark County Geographic Information Services Center in Montana.

A 520Kb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE

 
< Prev   Next >

 American Surveyor Recent Articles
 
Editorial: Surveyors Get the Point
For me, the 6th annual ESRI Surveying and Engineering Summit represented a sea-change. While earlier meetings I attended were designed to attract surveyors into the world of GIS, the trend has taken hold and surveyors everywhere are busy incorporating GIS into their work flows. I like the way ....
Read the Article
 
Point to Point: Can Retracements Be Confidential?
Do your clients have a right to expect that the survey you conduct for them will be confidential? Let's assume for a moment that mandatory survey recording laws did not exist (and indeed, they do not exist in most areas) and that no other obligation to divulge the results of the ....
Read the Article
  
WowFactor: TPC Desktop 2008 Global Background Clearing
TPC Desktop 2008 is all about making it easier to work with your survey data and drawings. It's about doing less work and getting more done. Their new Global Background Clearing is a good example. We put a lot of information on drawings. Take a typical ALTA or site survey-- they can ...
Read the Article
 
Wildfire Maps Keep Agency Missions Blazing Forward
Blazing out of control wildfires have been sweeping across northern California this summer just as they did last fall in the southern region of the state and many times previously, leaving in their path death and destruction. These fires are ...
Read the Article
 
Applanix: Solutions for Mobile Mapping and Positioning
It's a given that Global Navigation Satellite Systems (GNSS) don't work everywhere, for example if the signals are sufficiently blocked by such things as tree canopy, or urban canyons. Because of the need to locate things everywhere, a great deal of ....
Read the Article
 
RTN-101: Mapping (Part 14)
Much of what surveyors do is essentially mapping, and much of mapping is/could/ would/should be characterized as surveying. But what certainly raises the blood pressure of many surveyors is when one puts the two terms in the same sentence, as I have just done. The debate over....
Read the Article
 
The Marriage of GIS and Land Surveying (No Shotgun Needed)
Too often the GIS professional and the surveyor are at odds; a hoity-toity GIS guy looks askance at a muddy-booted surveyor who wants to pin him down on accuracy and ...
Read the Article
 
Software Review: I-Site Studio 3.0 and 4400 Laser Scanner
It seems that every surveying magazine now overflows with stunning 3D images of everything from people, to cars, to historic landmarks, to infrastructure. Point clouds of intricate structures and shapes naturally captivate the geometrically adept mind. But what about the ...
Read the Article
 
Product Review: SECO Poles and Prisms
Tired of prism pole slippage and non-adjustable prism pole bubble levels? Tired of tilting prism target assemblies that slip as you are walking back to the instrument or having to lift the prism pole out of the bipod ring, or not being able to adjust the "spring" out of ...
Read the Article
 
Vantage Point: If Not Now, When?
June was a difficult month. A friend less than a year older than I am quickly succumbed to a resurgence of breast cancer. A colleague three years younger suddenly died of complications related to diabetes, although he had looked fine just a few months ago when I last saw him. Such events make ...
Read the Article
 
Surveying `Da Situation: The Last Straw
It is bad enough that we've already had to endure months of election campaign rhetoric, but I read an article awhile back that was the last straw. I happened to be scanning the newspaper when I came across a piece reporting that the rock star Bruce Springsteen had ...
Read the Article
Featured Amerisurv Events
List Your Event Here
please
contact Amerisurv
15th Annual GeoTech - October 7-8,  2008, NOAA’s Auditorium and Science Center in Silver Spring, MD. Hosted by Potomac Region of the American Society of Photogrammetry and Remote Sensing and co-hosted by the NGS, 1 day of Workshops taught by experts, and 1 day of Technical sessions.,  

27th Annual International Submerged Lands Management Conference - October 26-29, 2008, Traverse City, Michigan. For managers, regulators and practitioners whose work affects or is affected by submerged lands management.

•  GITA's First Annual GIS for Oil & Gas Conference - Calgary - Nov. 6-7, 2008, Calgary Marriott Hotel, Calgary, Alberta, Canada. The GIS for Oil & Gas Calgary Conference will build on the momentum from GITA’s GIS for Oil & Gas Conference held in Houston, Texas, every September.

GITA's “How to Financially Justify Your Geospatial Projects” Two-day Workshop - Nov. 13-14, 2008 in Denver, Dec. 11-12, 2008 in Tampa. All types of organizations now have a unique opportunity to learn from GITA’s landmark research project, “Building a Business Case for Geospatial Information Technology: A Practitioner’s Guide to Financial and Strategic Analysis.”

Geography in Las Vegas - March 22–27, 2009. Join 8,000 geographers, GIS specialists, and environmental scientists from around the world in Las Vegas for the very latest in research, policy, and applications in geography, sustainability, and GIScience, during the annual conference of  the Association of American Geographers. 

California Land Surveyors Association 2009 Conference - March 28-April 1, 2009, Hilton San Diego Resort (Mission Bay). This e-mail address is being protected from spam bots, you need JavaScript enabled to view it , (707) 578-6016.

SPAR 2009 - March 30- April 1, 2009, Hyatt Regency Hotel, Denver, Colorado. SPAR 2009 will focus on best practices for using 3D imaging technologies to design and deliver capital projects as well as operate, modify and maintain production, manufacturing and infrastructure assets.


Share This Item

del.icio.us / Furl/ digg this item!Digg / Slashdot / Y!MyWeb / reddit / newsvine  addtoany
Share on Facebook
Google
 
AMERISURV TOP NEWS


Are you getting our e-newsletter?
Sign up and check out the archives HERE


GOT NEWS? Send To:
submit press

News Feeds

 
Subscribe to Amerisurv news & updates via RSS or get our Feedburn
xml feed

Sponsor


Historic Maps
Careers

post a job
Reach our audience of Professional land surveyors and Geo-Technology professionals with your career ad. Feel free to contact us if you need additional information.

 

RSS Feed Options
add to my yahoo!
add to newsgator
add to my AOL
add to bloglines
add to netvibes
add to my google
view with HubDog
technorati
xml feedView Feed XML
 
Need help implementing RSS?
Read this fine tutorial

Add to my Widsets
Amerisurv Mobile



The American Surveyor ©2003 - 2008 All rights reserved / Privacy Statement
Spatial Media LLC
905 W 7th St #331
Frederick MD 21701
301-620-0784
301-695-1538 - fax