Network corrected real-time is a technological approach to high precision GPS/ GNSS positioning that has been theorized about, studied, experimented with, and implemented in various academic, scientific, and commercial forms for nearly a decade.
Click Here to begin the series,
or view the Article PDF's Here
Test Yourself
Got Answers?
Test your knowledge with NCEES-level questions. Start HERE
Meet the Authors
Check out our fine lineup of writers. Each an expert in his or her field.
Selecting Multi-function Survey Tools for GIS, Design, and Construction
Written by Robert Davis
Monday, 28 February 2005
A 806Kb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE
Limestone County, Alabama, lies at the northernmost boundary of the state, just below the Tennessee line. The City of Athens is the only major municipality within this rural county. Like many other undeveloped areas across the nation, Athens lies in an eddy created by the rapid current of development in neighboring areas. Athens is situated within a triangle of three larger rapidly developing communities—Huntsville, Decatur, and Florence. Even though Limestone County is still relatively rural and undeveloped, it is under the high-tech influence of Huntsville, a major center for aerospace research and development.
Jonathan Bedsole (pictured) is a very busy man. He’s the Staff Engineer for the Water Services Department in Athens, Alabama. Water Services is a division of Athens Utilities, a municipal corporation that also owns and manages water, wastewater, electric, and natural gas services for the City. His department serves approximately 9,500 water and 5,200 wastewater customers.
The Road to Athens
Jonathan Bedsole comes from a strong professional background. His father was a civil engineer for the Tennessee Valley Authority (TVA). While Bedsole was completing his degree in Civil Engineering at Auburn University, he worked in a co-op program with the City of Florence, Alabama. He was subsequently hired to fill a position that became available shortly after he completed his degree in 1997. His scope of duties included wastewater design tasks, subdivision inspections, site plan reviews, and working with the field survey crew from time to time. He also gained some fledgling GIS experience by cataloging street data for mapping purposes. Municipal layoffs at the end of 2002 left him seeking another position.
In December 2002, he was hired by Athens Utilities in his current capacity. Bedsole is responsible for all construction, inspection, and mapping of both systems. His duties include reviewing development and construction plans to make sure they meet City standards. He is also responsible for inspecting new construction as needed to ensure compliance. As problems arise, he contributes his engineering experience to seeking appropriate solutions. Recently he began work on a new challenge to his professional expertise--the implementation, creation, and management of a mapping database for his systems mandated to interface with Limestone County's developing GIS network.
GIS Consortium
Limestone County established a Consortium to govern and direct the implementation of a comprehensive GIS network to serve governmental entities and public services. The participants include all City and County governments and utilities, the Sheriff's department, local police departments, 911 emergency services, the City of Athens Public Works Department, and the regional hospital. Within this network, each participant will maintain its own database. The mission of the Consortium is to establish operational parameters that insure connectivity and compatibility among all users. All individual databases must be capable of being viewed and read by others without going to the owner's site.
To guarantee that the entire GIS system is up to date, a county-wide flyover is planned. A grid of survey monumentation based on the Alabama State Plane West coordinate system will be set throughout the county. Surveyors will be then be required to tie their maps and as-builts to it. This will facilitate management of databases and enable them to be updated continuously and seamlessly.
Water Services Needs
Bedsole formulated a strategic plan to get the Water Services GIS database up and running. Starting from scratch, he realized the primary objective was the interface with the county-wide network. To better serve the needs of his department, he also wanted to create a system that could be used for accurate modeling and design purposes as well as mapping functions.
Bedsole's first step was establishing a working relationship with a consulting firm in Huntsville that specializes in Asset Management / GIS services. The company has built several systems for other municipalities in north Alabama, including City of Florence utilities and the Athens Gas Department. The consultants will build the database framework, customized specifically for the needs of Water Services, and will supply the operating software. The acquisition of location and attribute data for all existing lines, valves, and treatment plant facilities will be the responsibility of Water Services. Once the database is built for the existing facilities, a direct data import function will enable it to be continuously updated as systems expand and new installations are constructed.
Purchasing instruments to acquire location data on existing facilities was the next step. Bedsole sought a solution that would also accomplish this and several other survey tasks. From time to time, his job requires him to locate unmarked property corners and boundaries. He also needs accurate as-builts of new facilities. Since he is responsible for designing new sanitary sewer and water facilities, primarily expansions and extensions of systems already in place, he needs to quickly obtain accurate data about existing installations. Bedsole set out to purchase a survey system that would meet his multiple objectives. Knowing that most GIS mapping systems were designed for submeter accuracy location tasks, he determined the need for "survey grade" instruments. Submeter instruments would probably produce acceptable results for water system installations, but would be useless for his intended wastewater system purposes.
Bedsole's position as a municipal employee required that he comply with certain procurement policies to guarantee a public, competitive opportunity. To learn more about currently available products and their capabilities, he contacted three vendors for equipment demonstrations and recommendations. One of them was Hayes Instrument Company, a Topcon dealer located in Shelbyville, Tennessee. Bedsole knew about them through his work at the City of Florence. He was impressed with the service they gave them on repairing survey instruments.
In order to compose a comprehensive bid specification, Bedsole tried to address all his current and future needs. He included features like cell phone capabilities that would allow communication to a central base station on a network. After completing the demonstrations of products from three different manufacturers, he was satisfied that all three would meet his intended purposes. He proceeded to write a general specification that could also be filled by other products if they met his required criteria. The bid was advertised publicly.
Positive Results
Hayes Instrument Company came in with the lowest cost bid. Hayes' proposal included both a Topcon HiPer Lite GPS system and a GTS 235W wireless total station, specifically targeted to meet the needs of Water Services. Roger Wheeler, sales representative from Hayes, scheduled a date for delivery and training on the instruments. Since Bedsole was fairly proficient with survey instruments, he didn't require a lot of technical training. Bedsole planned to put the equipment to work immediately. He wanted to establish a grid of control points across his systems to expedite field operations. The control points needed to be set at secure locations where the GPS base antenna could be left unattended during working hours without risking vandalism or theft. He planned to locate these points on or near facilities such as water tanks and treatment plants. After Bedsole's orientation on the new equipment was completed, Wheeler stayed on and helped him collect a static GPS location. They set the first control point in the parking lot of Athens Utilities.
In the weeks that followed, Bedsole grew to appreciate the cable-free operation of the equipment (communications between the data collector and either the GTS 235W total station or the HiPer Lite GPS antenna are enabled wirelessly using Bluetooth technology) and the ability to swap back and forth between the total station and GPS unit while operating in the same database. Topcon's GPS base and rover are essentially the same unit, but with different software configurations. When a Continuously Operating Reference Station (CORS) network is established in his operating area, he will be able to convert both units to rovers for a minimal cost without investing in new equipment.
Out in the Field
Recently Bedsole had an opportunity to use the HiPer Lite GPS system for an engineering application. A major creek formed by the confluence of two smaller streams flows through the downtown area of the City of Athens. Over the past year, this area has experienced serious flooding. The Public Works Department proposed the construction of two large detention basins to mitigate the storm water flow through the area.
A newly constructed wastewater line was located in the area of a proposed earth berm. An extension of this line was being considered to serve a new subdivision that is in the conceptual design stage. A water distribution pump station is also located in the area. Bedsole went to the site and surveyed all water and wastewater facilities in the surrounding area to determine potential conflicts and confirm that the new sewer extension could be placed in a northwesterly orientation under the proposed berm. The sewer extension was completed before the construction of the earth berm. Utilizing the HiPer Lite GPS system enabled Bedsole to determine a cost-efficient solution for a situation that could easily have been problematic in the future. He was impressed with the performance of the equipment, and commented, "I had a 10-foot wide swath cut by a bulldozer. I was actually working in tree canopy, pretty stout tree canopy, and got a survey-grade lock."
Bedsole described another situation where the GPS unit solved a problem. "We had a local surveyor who had a bust on a route and was trying to determine where it was," he said. "To help him out, we got together and shot several USGS bench marks. We were able to discover where the bust was. One of the bench marks was at the County Courthouse. The HiPer Lite G P S rover was within seven-hundredths of a foot of the known elevation at that point."
Completing the Database
Currently, Bedsole is in the process of obtaining location data on existing installations to build his GIS database. He is working on it himself as time allows, or as part of the routine of his other responsibilities. As new projects and subdivisions are constructed, he collects location and feature data before structures are built. At the present time, his department requires paper as-builts from contractors. Bedsole intends to change that requirement and make digital asbuilts mandatory, referenced to the Alabama State Plane and the countywide monumentation.
In the near future, he plans to hire one or two co-op students to use the HiPerLite and a tablet PC to collect point location data. Needing only minimal skills, they will still be able to shoot each point and enter a simple descriptor. To avoid inaccuracies, they will not be required to identify or determine any other attributes of the location.
Bedsole will travel the system with the field superintendents, who are most familiar with the existing installation, to determine and enter the attribute data for each location. As sections of the water and wastewater systems are completed, they will be incorporated in the G I S database. Bedsole expects that it will be three to four years to complete data acquisition and make the GIS database fully functional. At that point, he will turn his focus to utilizing the information gathered in a dynamic model for both the water distribution and wastewater collection systems.
Robert Davis is a technology writer who lives in Alabama.
A 806Kb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE
Editorial: Surveyors Get the Point
For me, the 6th annual ESRI Surveying and Engineering Summit represented a sea-change. While earlier meetings I attended were designed to attract surveyors into the world of GIS, the trend has taken hold and surveyors everywhere are busy incorporating GIS into their work flows. I like the way .... Read the Article
Point to Point: Can Retracements Be Confidential?
Do your clients have a right to expect that the survey you conduct for them will be confidential? Let's assume for a moment that mandatory survey recording laws did not exist (and indeed, they do not exist in most areas) and that no other obligation to divulge the results of the .... Read the Article
WowFactor: TPC Desktop 2008 Global Background Clearing
TPC Desktop 2008 is all about making it easier to work with your survey data and drawings. It's about doing less work and getting more done. Their new Global Background Clearing is a good example. We put a lot of information on drawings. Take a typical ALTA or site survey-- they can ... Read the Article
Wildfire Maps Keep Agency Missions Blazing Forward
Blazing out of control wildfires have been sweeping across northern California this summer just as they did last fall in the southern region of the state and many times previously, leaving in their path death and destruction. These fires are ... Read the Article
Applanix: Solutions for Mobile Mapping and Positioning
It's a given that Global Navigation Satellite Systems (GNSS) don't work everywhere, for example if the signals are sufficiently blocked by such things as tree canopy, or urban canyons. Because of the need to locate things everywhere, a great deal of .... Read the Article
RTN-101: Mapping (Part 14)
Much of what surveyors do is essentially mapping, and much of mapping is/could/ would/should be characterized as surveying. But what certainly raises the blood pressure of many surveyors is when one puts the two terms in the same sentence, as I have just done. The debate over.... Read the Article
The Marriage of GIS and Land Surveying (No Shotgun Needed)
Too often the GIS professional and the surveyor are at odds; a hoity-toity GIS guy looks askance at a muddy-booted surveyor who wants to pin him down on accuracy and ... Read the Article
Software Review: I-Site Studio 3.0 and 4400 Laser Scanner
It seems that every surveying magazine now overflows with stunning 3D images of everything from people, to cars, to historic landmarks, to infrastructure. Point clouds of intricate structures and shapes naturally captivate the geometrically adept mind. But what about the ... Read the Article
Product Review: SECO Poles and Prisms
Tired of prism pole slippage and non-adjustable prism pole bubble levels? Tired of tilting prism target assemblies that slip as you are walking back to the instrument or having to lift the prism pole out of the bipod ring, or not being able to adjust the "spring" out of ... Read the Article
Vantage Point: If Not Now, When?
June was a difficult month. A friend less than a year older than I am quickly succumbed to a resurgence of breast cancer. A colleague three years younger suddenly died of complications related to diabetes, although he had looked fine just a few months ago when I last saw him. Such events make ... Read the Article
Surveying `Da Situation: The Last Straw
It is bad enough that we've already had to endure months of election campaign rhetoric, but I read an article awhile back that was the last straw. I happened to be scanning the newspaper when I came across a piece reporting that the rock star Bruce Springsteen had ... Read the Article
• 15th Annual GeoTech - October 7-8, 2008, NOAA’s Auditorium and Science Center in Silver Spring, MD. Hosted by Potomac Region of the American Society of Photogrammetry and Remote Sensing and co-hosted by the NGS, 1 day of Workshops taught by experts, and 1 day of Technical sessions.,
• GITA's First Annual GIS for Oil & Gas Conference - Calgary - Nov. 6-7, 2008, Calgary Marriott Hotel, Calgary, Alberta, Canada. The GIS for Oil & Gas Calgary Conference will build on the momentum from GITA’s GIS for Oil & Gas Conference held in Houston, Texas, every September.
• GITA's “How to Financially Justify Your Geospatial Projects” Two-day Workshop - Nov. 13-14, 2008 in Denver, Dec. 11-12, 2008 in Tampa. All types of organizations now have a unique opportunity to learn from GITA’s landmark research project, “Building a Business Case for Geospatial Information Technology: A Practitioner’s Guide to Financial and Strategic Analysis.”
• Geography in Las Vegas - March 22–27, 2009. Join 8,000 geographers, GIS specialists, and environmental scientists from around the world in Las Vegas for the very latest in research, policy, and applications in geography, sustainability, and GIScience, during the annual conference of the Association of American Geographers.
• California Land Surveyors Association 2009 Conference - March 28-April 1, 2009, Hilton San Diego Resort (Mission Bay).
This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
, (707) 578-6016.
• SPAR 2009 - March 30- April 1, 2009, Hyatt Regency Hotel, Denver, Colorado. SPAR 2009 will focus on best practices for using 3D imaging technologies to design and deliver capital projects as well as operate, modify and maintain production, manufacturing and infrastructure assets.
Reach our audience of Professional land surveyors and Geo-Technology professionals with your career ad. Feel free to contact us if you need additional information.