We continue our examination of boundary doctrine by exploring the topic of practical location. Practical location is defined as the location of the grant as inferred from the subsequent acts of the parties to the deed. A flavor of extrinsic evidence, it plays a major role in certain types of retracements, despite little mention of it in our boundary literature.
A couple of hurdles must be overcome before this type of evidence can be considered. First, the deed itself must have latent ambiguities as to the location of the land. (Remember, patent ambiguities void the deed outright; latent ambiguities--those anomalies uncovered only after analysis, invite extrinsic evidence to assist in deed interpretation.) The terms of unambiguous deeds cannot be varied by practical location or any other influence without subsequent transactions between the parties. (Or court action, of course.) Permitting otherwise would obviate committing the transaction to writing in the first place. Second, tangible evidence of the parties' actions must exist to incorporate into our work.
Right-of-Way Plats
In the November issue, I mentioned a retracement some years ago wherein the task was to reproduce interstate highway right-of-way lines. I am sure this varies from state to state, but in Maryland prior to the 1980s, few right-of-way monuments were set pursuant to road takings (not the fault of the surveyors involved, of course, but likely the result of non-surveyors in those departments considering the cost of post-construction surveys to be a waste of budget). A numbered right-of-way plat was prepared depicting the centerline of the taking, along with various offsets to the outer right-of-way lines, sundry drainage easements and the like, all referenced to the centerline. The deed conveying the land to the government contained no description, but merely called the numbered plat and incorporated it by reference. This is all very proper. Some of the plats even mentioned permanent monuments tied to the centerline aforesaid, although I never encountered any. The older title lines were sketched in on the plat, but no geometric relationship between the old lines and the new lines was specified. (I should note here that current highway department practice in my state mandates that geometric relationships between the old and new lines are specified in detail--ironically creating another potential wrinkle, but that is a topic for another day.)
Ordinarily, a plat that calls for no monuments and which has no ties to older title lines would present a significant retracement problem. Indeed, absent a link between paper and field, there is no way to place the new taking on the ground.
However, the doctrine of practical location delivers the goods. This doctrine allows us to consider the original improvements as evidence of the transaction, as long as they were constructed by one of the parties afterward (and acquiesced to by the other). Essentially, the theory rests upon the premise that parties do not contract to do one thing and immediately do something else. State highway departments ordinarily do not acquire land to build a road in one spot and then build it in another. The same can be said for public works of any stripe. The improvement locations thus are strong indications of acquisition intent. Delving into the theory a bit further would reveal estoppel overtones as well, but for our purposes the intention approach fits nicely.
Interstates
For interstates (and other heavy construction improvements), this gambit refocuses our field search efforts from "hard evidence" (iron pipes, stones, and so forth) and possessory evidence (fences, etc.) to identifiable elements which still exist from the original construction plans. If the original construction conformed to the design, and if the design was in accord with the acquisition document (the plat), then the original construction must be in accord with the plat. Usually this requires study of the construction plans in addition to the right-of-way documents to learn the intended relationship of the various improvements to the centerline. The improvements, then, become the monument memorializing the right-of-way location.
Analysis of this type requires careful judgment and an understanding of the likely precision of the construction. Bridge piers, for instance, are typically built to a higher tolerance than drainage swales. Therefore, in selecting the construction elements we must bear in mind the likely construction tolerance and weight accordingly. (This, incidentally, is one of the few cases where I believe it is appropriate to incorporate a least squares analysis in retracement.) In my experience, one can achieve satisfactory results using this method.
I once was required to retrace a parcel that abutted a six-lane interstate, the improvements of which were an elevated road 50-60 feet in the air on a gentle horizontal curve. No monuments were called for in the acquisition documents, and, in fact, the documents anticipated future ramps generally parallel to the centerline that were never built. The roadway itself was supported by sets of giant concrete piers set at specific deflections to the centerline. By using the bridge plans which referenced each set of piers to the centerline, we were able to relate the physical piers--and thus the centerline of construction--to our work. The right-of-way line fell into place.
Without the doctrine of practical location, however, a retracement of the interstate limits would have been out of reach.
Not for Every Case
But this is not a cure-all. Practical location, as for all forms of extrinsic evidence, cannot be used to alter the clear terms of the deed. Only to the extent that clarification is needed, can it clarify. It cannot be used, for example, as justification for reducing a plat radius of 5,729.58 feet to 5,500.00 feet because the latter radius matched the constructed improvements. For reasons explained at length in earlier essays, extrinsic evidence is not competent to redefine the terms of the grant. Furthermore, subsequent improvements to the constructed work (later widening of an interstate, for example), cannot be considered evidence of the original transaction.
For those situations demanding it, however, practical location can be the silver bullet.
Joel Leininger is a principal of S.J. Martenet & Co. in Baltimore and Associate Editor of the magazine.
A 87Kb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE
Editorial: CGSIC in Savannah
The 48th meeting of the Civil GPS Service Interface Committee (CGSIC) was held September 15-16, 2008 in Savannah, Georgia. Of particular note was the announcement that NDGPS will continue. Funding is still a challenge, but the powers that be have decided that NDGPS, like GPS, is .... Read the Article
Point to Point: Relatively Speaking
Sooner or later it happens: one of your friends or relatives asks you to survey their property, or otherwise act professionally on their behalf. Is that all right or do we have a higher obligation to the public concerning impartiality? Although I have not conducted an exhaustive examination of the .... Read the Article
More Than a Simulation
When work such as land surveying requires precision and gets impacted by changing technology, it makes sense to be introduced to high-tech equipment on an actual project rather than on a simulation exercise or in a classroom setting. That runs counter to ... Read the Article
Optech Incorporated: The Lidar Company
In the early 70s, Dr. Allan Carswell, a physics professor at York University in Toronto, developed a pulsed laser system used in the world's first lidar bathymetric mapping system. Based on his research, Carswell founded Optech Incorporated in ... Read the Article
The Wow Factor: SmartWorx from Leica Geosystems
Every version of Leica Geosystems software contains user requested features. The latest product request that made the final cut was a "Field to Office" application. This full-featured FTP and transfer software is now built into the operating system of all System 1200 sensors, making it possible for .... Read the Article
Visualizing N G S Control Stations in Google Earth
Google Earth is rapidly becoming the land surveyor's tool-of-choice for preliminary job site reconnaissance and survey planning (see "Topography is Dead," by Joel Leininger, March 2007). Survey projects often begin with the investigation and .... Read the Article
Surv-Fi, Part 2: Boomer's Hearing
Stand back from the cradle Hector!" Vel warned her colleague. "You could receive a rather nasty static shock as it spins up!" Hector Fontecilla stood shivering in the still Chilean Patagonia morning awaiting instructions from Vel Kawashima. Ten thousand ... Read the Article
Tips & Tricks: Hidden Point Offset
Let's say it's 5:30 Friday afternoon and you're past ready to call it a week. You've just calculated the angle and distance to look for one of the last monuments you need to tie in. You turn the instrument to the angle and shoot a distance that measures just behind a tall tree. After a few minutes' search ... Read the Article
FeedBack
Wendy, quite possibly the best article ever written in a surveyor's journal ["If Not Now, When? Sept. 2008]. It matters not how technically proficient we are, how much money we make or how well "esteemed" we seem to be in our profession when we face serious illness or death. What do our friends and ... Read the Article
Vantage Point: Diversions in the Park
There is not a lot of unused land in our urban and increasingly suburban areas. It disappears under shopping centers and houses and roadways at a rate unimaginable a century ago. So it may not be unusual to start eyeing land that was set aside for parks and open space at ... Read the Article