About Amerisurv| Contact    
Magazine | Newsletter    
Flickr Photos | Advertise    
HomeNewsNewsletterAmerisurv DirectoryJobsStoreAuthorsHistoryArchivesBlogVideosEvents
 
advertisement


Subscriptions
Sponsored By

Software Reviews
Continuing Series
     RTN
An RTN expert provides everything you need to know about network-corrected real-time GNSS observations.
Click Here to begin the series,
or view the Article PDF's Here
76-PageFlip Compilation
of the entire series
Test Yourself

Got Answers?
Test your knowledge with NCEES-level questions.
  Start HERE
Meet the Authors
Check out our fine lineup of writers. Each an expert in his or her field.
Wow Factor
Sponsored By


Product Reviews
Partner Sites

machinecontrolonline 


lbszone.com

GISuser.com

GeoJobs.biz

GeoLearn

 

Spatial Media LLC properties

Associates

ASPRS

newsnow 

Home arrow Archives   The American Surveyor     

GIS—Just a Tool: Common Misconceptions Print E-mail
Written by Stephen C. Blaskey, RPLS, LSLS   
Saturday, 30 June 2012

A 875Kb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE

GIS is a powerful tool that is currently being underutilized by land surveyors. This underutilization is costing the surveying industry time during the business day, which equates to wasted money. I am not here to preach that GIS will save the universe from all which is evil. This approach has been used by the existing proponents of GIS with little effect. In my view, GIS is simply a hammer, and if you need to drive nails a hammer is a great tool, but if you are cutting lumber a hammer is useless. The biggest fallacy of the existing users and proponents of GIS is thinking that the professional surveying industry needs to change the way that they conduct business in order to fit into a GIS world. Surveying has been practiced for thousands of years and changing the way that surveying is conducted all because of the invention of a new hammer is crazy. GIS is simply a tool for the professional surveyor to be more efficient, not a new way of doing business.

Having expressed my views, I feel I should introduce myself and my background in both land surveying and GIS. I have a Bachelor's of Science Degree in Geographic Information Science from Texas A&M--Corpus Christi; I am also a Registered Professional Land Surveyor, and a Licensed State Land Surveyor in Texas. I have been working in the surveying industry for just over a decade, and using GIS for almost all of that time.

In this series of articles I plan to tackle the myths that I have encountered as to why others in the surveying industry have not developed a GIS system to make their lives easier. A list of some of the myths I plan to discuss are as follows:

With the required software and hardware investment, it is too expensive for a small or mid size surveying firm to build a GIS.
The resources needed to start on the road of GIS will be surprising small when compared to the advantages that will be reaped from such a system. A thorough look at the software and hardware requirements can reveal many low cost--if not free--options to begin the framework of a GIS system. The trick is to be realistic as to what the system will accomplish, and to be sure that there will be a definite net gain on what advantages the GIS will provide. The idea that a surveying firm needs to dump tens of thousands of dollars into the development of a usable GIS is simply not true.

The time it will take to see a benefit from the GIS system is too large to be worth investing the energy to build it.
While there is a definite transition period before reaping the full benefits of a GIS system, the majority of this myth stems from the idea that the surveyor must change the way surveying is done to fit into the GIS. If the GIS is built with the processes of professional land surveying in mind this transition time can be minimized. The best time to plant an oak tree was 25 years ago; the second best time is today. The time to a full return of investment with GIS can be minimized with intelligent and efficient system design.

Georeferencing all of the historic data of a surveying firm is too much work.
There are many ways to accomplish this task, and not all of them require a surveying firm to go out and reoccupy every point that has ever been measured. Depending on the accuracy required for a typical project, this part can be done extremely fast. Also, it doesn't have to be done all at once to see real benefits from a GIS system.

Between hiring people to design, maintain, and use the GIS system, the surveying firm would have to find and hire specialized personnel.
If the GIS is designed to work the way the surveyor thinks, then its use can be made intuitive for the surveyor and there is no need for specialized personnel. And who better to design the way the GIS should handle the aspects of a surveying business than a surveyor? Careful planning and a basic knowledge of how databases work will provide the user of the system everything needed to capture all of the benefits of GIS.

In no way do I intend for this list to be all inclusive, and I am definitely open for discussing any other reasons for not utilizing GIS. Bending GIS to my needs as a surveyor has made it possible for me to get more work done at a lower cost with higher profitability. Contact me with suggestions or questions at Stephen@ surveygalveston.com.

Stephen Blaskey is a branch manager with Coastal Surveying of Texas, Inc., a mid-sized land surveying company in Galveston County, Texas. Both an RPLS and a Licensed State Land Surveyor in Texas, he also holds a degree in Geographic Information Science.

A 875Kb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE

 
< Prev   Next >

 American Surveyor Recent Articles
Editorial 
Thought Leader: Land is Too Important to Be Left to Land Specialists
A while back I was searching the Internet for an old treatise on land titles. A Google query yielded a book published in 1914. The author was Charles Claudius Kagey and the book was titled "Land Survey and Land Titles, a book for boys and girls, a reference volume for property owners, a text ....
Read the Article
Jason E. Foose, PS 
Decided Guidance: Wacker vs. Price - Irony in Sevenfold
This month's case takes us to Phoenix, Arizona in 1950. The Arizona Supreme Court went all guns-a-blazin' in Wacker vs. Price (216 P.2d 707 (Ariz. 1950)). Maybe it's just me, but I'm sensing plenty of irony and have taken license to point it out along the way. I like what the Court did with this case ....
Read the Article
Allen E. Cheves 
Around the Bend - A Visit to Carlson Software
The Ohio River is one of America's greatest, running near 1,000 miles between Pittsburgh and the Mighty Mississippi. Much of the coal and other products that fueled our nation's industrial expansion flowed between the shores of this maritime ....
Read the Article
Lee Lovell, PS 
Surveying & Mapping Economics Part 3 - Customers & Services
This article continues an inquiry into the economic conditions of the Surveying and Mapping industry (NAICS 541370) using data from the U.S. Census Bureau. This time we will look at customers and services. The data comes from the Economic Census conducted every 5 years on American ....
Read the Article
Jerry Penry, PS 
True Elevation: Black Elk Peak
Black Elk Peak, located in the Black Hills region of South Dakota, is the state's highest natural point. It is frequently referred to as the highest summit in the United States east of the Rocky Mountains. Two other peaks, Guadalupe Peak in Texas and ....
Read the Article
Larry Trojak 
Bringing The Goods - Mobile Scanning an Integral Component
When Jim Smith, Jerrad Burns and Charlie Patton left the Memphis division of a major construction company in 2015, they took with them the knowledge of how to get even the most complex jobs done and what equipment could best serve them in making that happen. So when they joined West ....
Read the Article
 
Lee Lovell, PS 
Test Yourself 41: Integers, Integers, and Integers
ABF is a 5:12:13 triangle, ACF is a 48:55:73 triangle, ADF is a 3:4:5 triangle, and AEF is a 7:24:25 triangle, all with integer sides and inscribed in a semi-circle. What are the lengths of BC, CD, and DE? ....
Read the Article
Wendy Lathrop, PS, CFM 
Vantage Point: Sunset or Sunrise?
While we often think of legislated government programs as static, they do change over time. Such evolution and opportunity for transformation are part of the dialogue in reauthorizing these programs. Every so many years there is a sunset on each government program, and this September is the ....
Read the Article
 

deliciousrssnewsletterlinkedinfacebooktwitter

Amerisurv Exclusive Online-only Article ticker
Featured Amerisurv Events
List Your Event Here
please
contact Amerisurv


Google
 
AMERISURV TOP NEWS

JAVAD Intros
Spoofer Buster

GOT NEWS? Send To
press [at] amerisurv.com
Online Internet Content

Sponsor


News Feeds

 
Subscribe to Amerisurv news & updates via RSS or get our Feedburn
xml feed

Need Help? See this RSS Tutorial

Historic Maps
Careers

post a job
Reach our audience of Professional land surveyors and Geo-Technology professionals with your GeoJobs career ad. Feel free to contact us if you need additional information.

 

Social Bookmarks

Amerisurv on Facebook 

Amerisurv LinkedIn Group 

Amerisurv Flickr Photos 

Amerisurv videos on YouTube 

twitter

 




The American Surveyor © All rights reserved / Privacy Statement
Spatial Media LLC
905 W 7th St #331
Frederick MD 21701
301-620-0784
301-695-1538 - fax