About Amerisurv| Contact    
Magazine | Newsletter    
Flickr Photos | Advertise    
HomeNewsNewsletterAmerisurv DirectoryJobsStoreAuthorsHistoryArchivesBlogVideosEvents
 
advertisement


Subscriptions
Sponsored By

Software Reviews
Continuing Series
     RTN
An RTN expert provides everything you need to know about network-corrected real-time GNSS observations.
Click Here to begin the series,
or view the Article PDF's Here
76-PageFlip Compilation
of the entire series
Test Yourself

Got Answers?
Test your knowledge with NCEES-level questions.
  Start HERE
Meet the Authors
Check out our fine lineup of writers. Each an expert in his or her field.
Wow Factor
Sponsored By


Product Reviews
Partner Sites

machinecontrolonline 


lbszone.com

GISuser.com

GeoJobs.biz

GeoLearn

 

Spatial Media LLC properties

Associates

ASPRS

newsnow 

Home arrow Archives   The American Surveyor     

Footsteps: Fripps Versus Walters Print E-mail
Written by Landon Blake, LS   
Friday, 04 May 2012

A 467Kb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE

In 2005 a California court case involving the boundary common to portions of a PLSS ¼ section was decided. In this installment of Footsteps we will examine that case for lessons we can glean as boundary surveyors. We'll start with a discussion of the timeline for the events in the case. This timeline will include transactions involving the two parcels on either side of the boundary line. This timeline can get a bit confusing, so consult the timeline diagram if you want to view the transactions for each parcel as a separate chain.

Timeline
1923: Ida Dempsey and her daughters, Marguerite Dempsey and Ruth Haddick convey a portion of the southeast ¼ of Section 13 to HH Stoddard. (Parcel Chain #1)

Ida and Marguerite convey their interest in the remainder of the ¼ section to Ruth. (Parcel Chain #2)

Tarter, Webster and Johnson, Inc. acquire the 39 acre parcel. (Parcel Chain #1)

1946: Luman acquires the 39 acre parcel from Tarter, Webster, and Johnson. (Parcel Chain #1) 1962: Sherrard acquires the 39 acre parcel from Luman. (Parcel Chain #1)

Ruth Haddick and the Sherrards deed parcels to the State of California for a realignment of State Highway 70. (Parcel Chain #1 and Parcel Chain #2)

6/6/1969: Sherrard files a parcel map subdividing the 39 acre parcel into four (4) smaller parcels. (Parcel Chain #2)

6/24/1969: Sherrard sells the northernmost parcel in the parcel map to the Walters. (Parcel Chain #1)

1994: Fripp's purchase the remainder of the ¼ section from the estate of Ruth Haddick. (Parcel Chain #2)

4/2000: Fripps hire a surveyor to perform a boundary survey of their property.

9/7/2005: Decision by Appeals Court in Favor of Fripps

Facts of the Case
There are a couple of important facts we need to consider before we look at the questions raised in this case. First, we need to take a look at the land descriptions for the Fripps Parcel and the Walters Parcel.

The important portion of the land description used when Ida and her daughters sold the 39 acre parcel to Stoddard in 1923 is as follows:

Beginning at the section corner common to Sections 13 and 24...18 and 19...and running thence North along the section line 780 feet; thence West 830 feet; thence South 48-39 West 333 feet; thence West 1560 feet; thence South 560 feet to the ¼ section corner between Sections 13 and 24...thence East 2640 feet to the place of beginning; containing 39 acres more or less.

Second, we need to look at how the 1969 parcel map resolved the boundary common to the Walters and Fripps parcels. The court states the civil engineer who stamped and signed the map held three (3) monuments with no record reference, stamp, tag, or other identifying marks to locate the north boundary. Although it isn't stated in the court decision, we can likely assume these monuments were found in the angle points of the common boundary in dispute.

Questions Raised
The appeals court was only interested in answering one legal question raised by this case. The Walters claimed the parcel map creating their north boundary was a "government sanctioned survey" because it had been reviewed by the County Surveyor. They asserted the boundary resolution shown on this parcel map could not be challenged because of the immunity granted government-sanctioned surveys.

The events surrounding this case also raise a couple of interesting questions that were not directly discussed by the court in its decision. These are:

1. Why did the civil engineer hold the monuments not of record? Was this the right decision?
2. Were the westerly and southerly calls along the boundary common to the Fripps and Walters parcel correctly interpreted by the retracing surveyor hired by the Fripps?

The Court's Decision
The court's decision on the one legal question heard on appeal was simple. A parcel map is not a governmentsanctioned survey. As a result, the parent parcel boundary shown on a parcel map can be successfully contested, as it was in this case. The court comments on several other cases related to the immunity of "government-sanctioned maps." I encourage you to read through this case to see those comments.

I believe most surveyors would agree with the court's decision on this question. If the court had decided differently, we would be presented with one of two very bad conclusions:

The subdivider could use an erroneous parcel map to subdivide and convey property he did not own.

The County Surveyor is responsible for the accuracy of every boundary resolution shown on parcel maps filed in his jurisdiction.

Clearly, neither of the above results is a desirable. We want those who subdivide and profit from the sale of subdivided lots to bear the cost of accurately surveying what they own. We do not want county surveyors to be solely responsible for the accuracy of the boundary resolution of parcel maps filed in their jurisdiction. That burden rightfully belongs to the surveyor (or in this case civil engineer) who has gathered the evidence, performed the field measurements, and who will profit (hopefully) from the filing of the parcel map. Map checking fees, as outrageous as they may be, don't pay for all of that. That work is (or should be) paid for by the subdivider, and his consulting surveyor or engineer should be expected to do that work.

Answers to Other Questions
What about the other two (2) questions we mentioned? Let's start with the first:

Why did the civil engineer hold the monuments not of record? There are a couple of possible answers to this question. The court doesn't comment on this issue extensively, as it was not the legal question being decided. However, a discussion of the possible answers to the question would be helpful.

We know the civil engineer found the monuments during his field survey. They may have appeared close to what he suspected was the location of the boundary common to the Fripps and Walters parcel. He may have even been told by the Walters that these were the monuments marking the common line.

To me, how he handled this evidence is the important question. What steps did he take to verify the reliability of these monuments? Did they fit well with physical occupation? Did they fit well with the geometry described in the land description? Did the monuments agree with the interpretation of the land description with the aid of a proper section breakdown?

If the civil engineer simply accepted these monuments after their discovery in his field survey, without answering this type of questions, even on the word of his client, he made big mistake.

If, on the other hand, he did review additional evidence and accepted these monuments after a thorough vetting process, his decision may have been sound. Tags and caps aren't always placed as they should be, and they often are removed, damaged, or lost. I've accepted monuments without tags or identifying marks before, and I've also accepted monuments not of record. The court doesn't provide the additional details, so we are left to wonder.

Now let's consider that second question:

Were the westerly and southerly calls along the boundary common to the Fripps and Walters parcel correctly interpreted by the retracing surveyor hired by the Fripps? The land description at issue in this case clearly left some things to be desired. How would you interpret a call for a course "west" in the description of the north boundary of the 39 acre parcel? You would have several options. These might include the following: 
• Hold the record angles in the description.
• Hold cardinal directions.
• Run parallel to the south line of the section.
• Run perpendicular to the east line of the section.
• Run parallel to the east-west ¼ section line of the section.
• Run on a mean bearing calculated from the south line of the section and the east-west ¼ line of the section.

There are perhaps more solutions I haven't included in my list. I certainly wouldn't hold cardinal directions in this case without some strong evidence that was the intent, but all of the other solutions seem to be reasonable. Which of the above methods would result in the smallest closure error? Which of the above methods would agree with physical occupation? Would any of the above methods agree with the monuments not-of-record? Could you use one of the methods above and have your distance calls match the elements of the section called for in the land description? Which method did the civil engineer filing the parcel map use? Which method did the retracing surveyor hired by the Fripps use? How big are the positional differences in the property corner locations between the different methods?

These are all important questions. The court doesn't answer them, so again, we are left to wonder. Still, it is helpful to ask yourself, "What would I have done as the surveyor creating the parcel map or the surveyor retracing the Fripps parcel?"

Important Lessons
This case has three (3) important lessons for surveyors.

3. Don't assume the boundary resolution shown on a parcel map is the correct one. This may be the easy solution, and it may be backed up by monuments on the ground, but it isn't always the correct solution. You don't want to be the land surveyor who relied on a parcel map or other filed map for a boundary resolution, only to have that decision later questioned and overturned by a court. Learn to question everything, even filed survey maps. Your peers are imperfect, and at times they record their mistakes in the public record.

4. You can hold monuments that are not identified with a tag, or those not of record, in a boundary resolution. However, if you do this,

be very careful. Walk through the analysis and extra work needed to vet the monuments. Don't just hold them because it is the convenient thing to do. Do your best to figure how who set them, why they were set, and the reason why they were set where in their particular locations. Be prepared to defend your decision to hold the monuments. It may have been the correct decision, but your battle to defend that decision may be difficult. Understand your reasons and make sure your logic is sound.

5. Be careful with calls for cardinal directions in deeds for parcels in the PLSS that do not contain explicit "along" calls which tie to section or aliquot parcel lines. These calls could be interpreted in a number of different ways. What was the intent of the deed that created the parcel? Which method of interpretation fits the best with the other evidence? Be prepared to answer these questions and explain your reasoning.

Landon Blake is currently project manager and project surveyor for a small civil engineering and land surveying company in California's Central Valley. Licensed in California and Nevada, his many activities include speaking and teaching at group conferences around the state.

A 467Kb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE

 
< Prev   Next >

 American Surveyor Recent Articles
Editorial 
Thought Leader: Land is Too Important to Be Left to Land Specialists
A while back I was searching the Internet for an old treatise on land titles. A Google query yielded a book published in 1914. The author was Charles Claudius Kagey and the book was titled "Land Survey and Land Titles, a book for boys and girls, a reference volume for property owners, a text ....
Read the Article
Jason E. Foose, PS 
Decided Guidance: Wacker vs. Price - Irony in Sevenfold
This month's case takes us to Phoenix, Arizona in 1950. The Arizona Supreme Court went all guns-a-blazin' in Wacker vs. Price (216 P.2d 707 (Ariz. 1950)). Maybe it's just me, but I'm sensing plenty of irony and have taken license to point it out along the way. I like what the Court did with this case ....
Read the Article
Allen E. Cheves 
Around the Bend - A Visit to Carlson Software
The Ohio River is one of America's greatest, running near 1,000 miles between Pittsburgh and the Mighty Mississippi. Much of the coal and other products that fueled our nation's industrial expansion flowed between the shores of this maritime ....
Read the Article
Lee Lovell, PS 
Surveying & Mapping Economics Part 3 - Customers & Services
This article continues an inquiry into the economic conditions of the Surveying and Mapping industry (NAICS 541370) using data from the U.S. Census Bureau. This time we will look at customers and services. The data comes from the Economic Census conducted every 5 years on American ....
Read the Article
Jerry Penry, PS 
True Elevation: Black Elk Peak
Black Elk Peak, located in the Black Hills region of South Dakota, is the state's highest natural point. It is frequently referred to as the highest summit in the United States east of the Rocky Mountains. Two other peaks, Guadalupe Peak in Texas and ....
Read the Article
Larry Trojak 
Bringing The Goods - Mobile Scanning an Integral Component
When Jim Smith, Jerrad Burns and Charlie Patton left the Memphis division of a major construction company in 2015, they took with them the knowledge of how to get even the most complex jobs done and what equipment could best serve them in making that happen. So when they joined West ....
Read the Article
 
Lee Lovell, PS 
Test Yourself 41: Integers, Integers, and Integers
ABF is a 5:12:13 triangle, ACF is a 48:55:73 triangle, ADF is a 3:4:5 triangle, and AEF is a 7:24:25 triangle, all with integer sides and inscribed in a semi-circle. What are the lengths of BC, CD, and DE? ....
Read the Article
Wendy Lathrop, PS, CFM 
Vantage Point: Sunset or Sunrise?
While we often think of legislated government programs as static, they do change over time. Such evolution and opportunity for transformation are part of the dialogue in reauthorizing these programs. Every so many years there is a sunset on each government program, and this September is the ....
Read the Article
 

deliciousrssnewsletterlinkedinfacebooktwitter

Amerisurv Exclusive Online-only Article ticker
Featured Amerisurv Events
List Your Event Here
please
contact Amerisurv


Google
 
AMERISURV TOP NEWS

JAVAD Intros
Spoofer Buster

GOT NEWS? Send To
press [at] amerisurv.com
Online Internet Content

Sponsor


News Feeds

 
Subscribe to Amerisurv news & updates via RSS or get our Feedburn
xml feed

Need Help? See this RSS Tutorial

Historic Maps
Careers

post a job
Reach our audience of Professional land surveyors and Geo-Technology professionals with your GeoJobs career ad. Feel free to contact us if you need additional information.

 

Social Bookmarks

Amerisurv on Facebook 

Amerisurv LinkedIn Group 

Amerisurv Flickr Photos 

Amerisurv videos on YouTube 

twitter

 




The American Surveyor © All rights reserved / Privacy Statement
Spatial Media LLC
905 W 7th St #331
Frederick MD 21701
301-620-0784
301-695-1538 - fax